Run-of-river small hydropower plant in mountain environment
Details of the Hydropower Plant:
Net head: 79.93 m
Maximum flow rate: 1200 l/sec
Penstock diameter: 900 mm
Penstock Length: 1835 m
Turbine type: 2 Francis
Installed Capacity: 740 KW
Energy Output: 2.770.000 KWh
Activities Performed:
Technical Feasibility
Economic Feasibility
Preliminary, Final and Detailed design
Tender documents
Environmental impact study
Assistance in tender award
Supervision of works