Project Description:
Hydraulic calculations and layout
Detailed input data for turbine design
Equipment design
Electric design- single line diagram
Calculation of possible annual energy yield
Generation model
Bill of Quantities
Preliminary BoQ for Civil Works
Preliminary BoQ for Mechanical and Electrical Components
Simplified study & calculation for economic feasibility
Annual cost/payback model for each power plant
Estimate price for generated electricity for 1 Kwh, financial model.
Pre-feasibility study and concept development of in-pipe hydropower plants installation in water supply systems, including estimation of energy potential and financial estimation.
Parameters of the four selected locations:- POTI SHPP:
Head range: 220 m
Water flow Q=316 L/sec
Pipe diameter D=500mm
Distance to line connection point: 30m - AKHALTSIKHE SHPP
Head range: 310
Water flow Q=180 L/sec
Pipe diameter D=426mm
Distance to line connection point: 100m - AKHALKALAKI SHPP
Head range: 145 m
Water flow Q=277 (SUM) L/sec
Pipe diameter D=250, 319, 400, 500mm (There are 4 parallel pipes and can be united);
Distance to line connection point: 250m - SADGERI SHPP
Head range: 200 m
Water flow Q=160 L/sec
Pipe diameter D=300 mm
Distance to line connection point: 150m
Hydraulic calculations and layout
Detailed input data for turbine design
Equipment design
Electric design- single line diagram
Calculation of possible annual energy yield
Generation model
Bill of Quantities
Preliminary BoQ for Civil Works
Preliminary BoQ for Mechanical and Electrical Components
Simplified study & calculation for economic feasibility
Annual cost/payback model for each power plant
Estimate price for generated electricity for 1 Kwh, financial model.
- Client:
- JDF Georgian Energy Development Fund
- Year:
- 2021
- Location:
- Georgia - Various Locations