

Run-of-river Small Hydropower Plant in mountain environment.
Details of the Hydropower Plant:
Net Head: 45,73 m
Maximum Flow Rate: 1100 l/sec
Penstock Diameter: 900 mm
Penstock Length: 1365 m
Turbine Type: 2 Francis
Installed Capacity: 371 KW
Activities Performed:
Technical Feasibility
Economic Feasibility
Preliminary, Final and Detailed design
Tender Documents
Environmental Impact Study
Assistance for Procurement
Supervision of Works