Run-of-river SHPP
Diversion Dam : 4m high and 72 m long
Headrace open canal: 594 m
Penstocks: 3, made of steel, 70m long.
Pesntocks' Diameters: 1800-1500-mm
Gross Head: 36.37 m
Turbine: 3 Francis groups
Design flow rate: 27 m3/s
Installed capacity: 7.8 MW
Energy output: 27 GWh
Activities Performed:
Pre-feasibility Study including:
Site Identification and Assessment
Topographical Survey
Feasibility study including:
Final Design
Power Evacuation Study
Business Plan