Run-of-river HPP with a 60m long diversion dam and a 1,480 m long headrace canal.
Gross Head: 40m
Maximum Flow Rate: 30.24 to 45 m3/sec
Turbine type: 3 to 4 Francis turbines
Installed capacity: 9,99 MW to 14.4 MW
Energy output: 85 to 125 GWh
Activities Performed:
Revision of a previous feasibility study
Assessment and substantial modifications of the design.
Preliminary business plan.
Full feasibility study
Full Business plan
Detailed topographic survey
Basic design
Assistance in tender documents