Run-of-river Small Hydropower Plant in mountain environment.
Details of the Hydropower Plant
Net Head: 151,28m
Maximum Flow Rate: 450 l/sec
Penstock Diameter: 500 mm
Length: 1405,00 m
Turbine type: Pelton, 4 injectors
Installed Capacity: 511 KW
Energy Output: 2.300.000 KWh
Activities Performed:
Technical Feasibility
Economic Feasibility
Preliminary, Final and Detailed design
Tender documents
Environmental impact study