

Run-of-river small hydropower plant in mountain environment
Details of the Hydropower Plant:
Net head: 174,89 m
Maximum flow rate: 300 l/sec
Penstock diameter: 500 mm
Penstock Length: 1620 m
Turbine type: Pelton
2 injectors horizontal axis
Installed Capacity: 450 KW
Energy Output: 2.400.000 KWh
Activities Performed:
Technical Feasibility
Economic Feasibility
Preliminary, Final and Detailed design
Tender documents
Environmental impact study
CDM / HS
Assistance in tender award
Supervision of works