

Run-of-river small hydropower plant in mountain environment.
Details of the Hydropower Plant:
Net head: 212,94 m
Maximum Flow Rate: 450 l/sec
Penstock Diameter: 600 mm
Penstock Length: 3.925,00 m
Turbine Type: Pelton, 4 injectors
Installed Capacity: 743 KW
Energy Output: 4.600.000 KWh
Activities Performed:
Technical Feasibility
Economic Feasibility
Preliminary, Final and Detailed design
Tender documents
Environmental impact study
Assistance for procurement
Supervision of works