Run-of-river small hydropower plant in mountain environment.
Details of the Hydropower Plant:
Net head: 100,21 m
Maximum flow rate: 300 l/sec
Penstock Diameter: 500 mm
Length: 1.300,00 m
Turbine Type: Pelton
4 injectors vertical axis
Installed Capacity: 218 KW
Energy Output:1.000.000 KWh
Activities Performed:
Technical Feasibility
Economic Feasibility
Preliminary, Final and Detailed design
Tender documents
Environmental impact study
CDM / HS
Assistance in tender award
Supervision of works