Project Description:
Run-of-river Small Hydropower Plant in mountain environment.
Details of the Hydropower Plant:
Net head: 94,54 m
Penstock Diameter : 800 mm
Penstock Length: 1091 m
Turbine type: 2 Pelton turbines
4 injectors
Installed Capacity: 880 KW
Energy Output: 3.015.000 kWh
Activities Performed:
Technical Feasibility
Economic Feasibility
Preliminary, Final and Detailed design
Tender documents
Environmental impact study