Torrent Rite flood management works

Project Description:

Flood management works affecting 0.7 km of torrent Rite's riverbed, in the Municipality of Cibiana di Cadore, Belluno. Italy.
The area is subjected to a high hydrogeological risk.


Works included:

  • Slope stabilization on the right bank necessary to limit erosion phenomena
  • Restoration works on existing structures to protect the town of Cibiana, including the selective wier.

  • Activities Performed:
    Landscape and Hydrogeological Assessment. Final and Detailed Design.
    Supervision of Works.
Client:
Genio Civile Authority of Belluno
Year:
2003
Location:
Cibiana di Cadore (BL), Italy

NEXT PROJECT

Torrent Zunaia Flood Management Works

RELATED PROJECTS

oselete exp map

“Oselete” Wastewater Treatment Plant Expansion and Upgrade

by webmaster
Project Layout

Extension of the sewerage system of the Municipality of Cesiomaggiore

by webmaster
Enco-Lingatunda Hydropower Plant3

Lingatunda Hydropower Plant

by webmaster

ENCO Engineering Consultants

Via Feltre, 183 – 32036 Sedico (BL)

P (+39) 0437 852727
F (+39) 0437 852717
E info@enco.energy

VAT N: 00607990256

MENU

  • About us
  • Expertise
  • Case studies
  • News
  • Contact us
  • Privacy Policy
  • Cookie Policy
© 2025 Enco Engineering Consultants srl. All rights reserved.
Shopping Basket